Run the whole operation on one system.
Planning, projects, events and customers on one platform, one source of truth, with HQ tying it together.
Book a callTwo months free. We load your data first.
Built to share one record.
Start small. Grow into one system.
- Start with one. Every tool is sold on its own. Pick the one that hurts most today.
- Add the next when you’re ready. Planner and Project lock together. No second login, nothing typed twice.
- Each one fits the last. CRM joins Planner: won work arrives with the client and the vessel.
- One system. Planner, Project and CRM are joined up today. Events is next.
Book it once. The next product picks it up.
- KeelSync EventsA card is scanned at your stand.
- KeelSync CRMEarly accessThe client and vessel are remembered.
- KeelSync PlannerThe work is booked and crewed.
- KeelSync ProjectSyncs todayThe refit is delivered on a live plan.
- Lead scanned at the show
- Client + vessel history attached (CRM, early access)
- 3 engineers booked, Tue 07:00
- Man-days worked out on the refit plan
Let’s talk.
Leave your work email. We’ll email you a time for a 15-minute call and set up your two free months.
Run the whole operation on one system.
Planning, projects, events and customers on one platform, one source of truth. Planner, Project and Events are live today, CRM is in early access, and HQ ties them all together. For service businesses, there’s KeelSync Service.

One operating system for how a marine engineering company runs. Not five tools that never talk.


Plan the week in a morning.
Every engineer, subcontractor, job and vessel on one live deployment board. The plan that took a week of phone calls and rota spreadsheets is done, client-ready, the same day.
- One live roster, always current
- Clashes surface the second they’d happen
- Client-ready plan out the same day
From the first handshake to the finished refit, one system.
This is the journey a client takes through KeelSync. Nothing gets retyped between steps: each product hands the record to the next. CRM → Planner and Planner → Project are joined up today; Events → CRM is next.
A prospect’s card is scanned at the show, and there’s a vessel that needs work.
The lead doesn’t get lost →Customer, contacts and the vessel’s history in one record that the other products pick up.
Won work goes to Planner →The job is booked and crewed on the live board: clashes cleared, a client-ready plan out the same day.
Pushed straight to Project →The same job lands on the refit Gantt: man-days worked out, a Monday email to the office and each crew. Synced from Planner today.
One record, end to endWe set it up with you.
No setup homework, no “figure it out yourself” trial. We load your data, train the team and stay on call until the board runs your week.
A quick call
We walk through your operation: engineers, vessels and how the week actually gets planned today.
15 minutesWe load your data
Your roster, companies and vessels are in before you first log in.
We do this partTwo months on real jobs — free
Plan the actual week on KeelSync alongside the old way, with us on call the whole time. Keep it if the board wins.
2 months free · no cardPlan tomorrow morning on KeelSync.
We load your data and train the team. You plan real jobs from day one. If the board doesn’t win the week, you walk away with a tidy roster export.
Book the 15-minute call
The things operators ask before they start.
Is our data safe?
Yes. Your roster lives in your own workspace, encrypted in transit and at rest, and access is controlled per user. We never sell it or share it with advertisers — see our privacy policy for the detail.
How much setup is involved?
Almost none on your side. We load your engineers, subcontractors, vessels and companies before your first login — usually within a day of the call — so you start on your real operation, not a blank board.
Do subcontractors count as engineers?
On the board, yes. They sit alongside your own crew, so you plan everyone in one place. No second spreadsheet, no separate system for outside contractors.
Does it handle multiple companies and currencies?
Yes. KeelSync runs multiple companies on one platform — each with its own jobs, records and currency, on one shared roster.
What happens after the two free months?
If it’s earning its place, you carry on. If it isn’t, you walk away — there’s no lock-in, and we help you export your data. We’d rather you keep it because it works than because you’re stuck.
Is it only for large teams?
No. It’s built for teams running anywhere from a handful of engineers to 60+ across several companies. The board scales with you either way.



